Coop Logistic Center, Schafisheim, Switzerland

  • PDF


Client: WaltGalmarini AG
Location: Schafisheim, Switzerland
Involvement of AEE: Structural Steel of Top Technical Center Calculation + Sketches
Design Status: Construction Completed in 2010
Construction Duration: 2010-2016

 

 

The new production and logistics center, measuring 186 m in length and 102 m in width, has 5 basement floors, a ground floor, 3 upper floors and a technical center in the attic. From the total height approximately 55 m of the building, approximately 30 m are over terrain, 25 m are underground. A two-late truck underpass is planned under the Rupperswiler street as a connection to the existing distribution center. A service bridge on the upper floor connects the two buildings for flow of goods and people.

 

 

 

 

 

 