Industrial Plants

KVA Bern, Switzerland

  • PDF


Client: WaltGalmarini AG
Location: Bern, Switzerland
Involvement of AEE: Detail Statical Calculation and Sketch
Design Status: Construction Completed
Construction Duration: 2009 - 2016

Read more...

Solar Valley-Ethiopia

  • PDF

 

Archtect: Pia Schmid
Client
: Stiftung Solarenergie
Location: Burayu, Oromia(West Addis Ababa)
Involvement of AEE: Complete Structural Design
Design Status: Partial Construction Completed in 2009

Read more...

Soufflet Malt Ethiopia

  • PDF

 

Client: Soufflet Malt Ethiopia
Location: Addis Ababa, Ethiopia
Involvement of AEE: Detail Civil Works Engineering Design and Supervision (Expected)
Design Status: Detail Design
Construction Duration: Current

Read more...

Coop Logistic Center, Schafisheim, Switzerland

  • PDF


Client: WaltGalmarini AG
Location: Schafisheim, Switzerland
Involvement of AEE: Structural Steel of Top Technical Center Calculation + Sketches
Design Status: Construction Completed in 2010
Construction Duration: 2010-2016

Read more...
Return